This project was completed in September
1999. The building is a seven storey split level carpark,
with a structure consisting of post tensioned flat slab floors
supported by reinforced concrete columns with shear walls provided
at the vertical lift and stair core. The foundations consist
of 450 diameter continuous flight auger piles supporting reinforced concrete foundations. A unique feature of the building is the cantilevered floor slab supporting a stainless steel facade mesh. A steel tower for training fire personnel was added at a later date.