LEISUREWORLD CHURCHFIELD
 
CLIENT:
Cork City Council
 
DESIGN BRIEF:
Project Management
  Civil & Structural
  Full Building Services
 
COMPLETION DATE:
May 2005
 
CONSTRUCTION VALUE:
€9,000,000
 
   
PROJECT DETAILS:

Churchfield Pool & Leisure Centre contains a 25m leisure pool, a learner and kiddies pool with play feature, sauna and steam rooms & relaxation area, a flume and viewing gallery. The adjoining ground floor areas include a changing village, plant rooms and reception area. The first floor has a state of the art gym, aerobics room, treatment rooms and offices. On the roof over the aerobics/office is a plant room.

The main pool hall structure consists of in.situ concrete columns with steel trusses over the 25m pool and steel beams over the learner/kiddies pool, both with a perferated metal liner sheet and standing seem roof. The adjoing filtration/gym and changing/aerobics structures consist of in.situ concrete columns, the first floors are in.situ beams and slabs as well as the roofs. The plantroom over the aerobics is made up from a steel structure supported on the flat concrete roof with cladded walls and roof.

Mechanical services included ventilation, air-conditioning, water services, soils and waste, pool water hydraulics and treatment, services to flume and water feature. This project was independently assessed and grant aided by Energy Ireland for energy efficiency methods.

Electrical services comprised of lighting, small power, fire alarm, intruder alarm & CCTV, voice evacuation systems, lightning protection, power factor correction, access control and lift installation

HOME SITE MAP COMPANY PROFILE CONTACT US